Ad Code

Responsive Advertisement

Ticker

6/recent/ticker-posts

MCQ ON MAINTENANCE AND REPAIR OF STRUCTURES PART 2

 

1) In case of Ultrasonic pulse velocity test, The quality grading of concrete is expressed in.

1) 4

2) 8

3) 6

4) 2

Ans is 4

 

2) In case of dense homogeneous and uniform concrete The ultrasonic pulse velocity test gives

1) High velocity

2) Less velocity

3) No change in velocity

4) Very less velocity

 Answer is a high velocity. Because The ultrasonic pulse will take more time. To cross across the dense and homogeneous concrete it will observe maximum obstruction.

 

 

 

3) Non-destructive test of ultrasonic pulse velocity test is conducted on concrete and Pulse velocity measured in meter per second is 2500 then the quality of concrete is

1) Excellent

2) Good

3) Medium

4) Poor or doubtful.

The answer is quality of concrete is poor or doubtful.

Pulse velocity in m/s

Concrete quality

Quality grading

Approximate compressive strength (N/mm2)

V> 4500

Excellent

I

>45

V=3500-4500

Good

II

25-40

V= 3000-3500

Medium

III

10-20

V<3000

Poor or doubtful

IV

<10

 

4) The approximate compressive strength of concrete in case of second quality grading in ultrasonic pulse velocity test is

1) More than 45

2) 25 to 40

3) 10 to 20

4) less than 10.   

Ans. is 25-40


5) Which of the following test is the easiest and fastest way for detecting details of reinforcing bar.

1)Ultrasonic pulse velocity test

2)Rebound hammer test.

3) Rebar locator test

4) none of the above.

Ans is 3) Rebar locator test


6) In respect of rebar locator test, The signal received will increase with increase in bar size but decrease with increasing cover. This statement is right or wrong.

1) Right

2) Wrong

Ans is right.


7) Which of the following test depends upon the electromagnetic field?

1) Rebound hammer test

2) Ultrasonic pulse velocity test

3) Rebar locator test

4) Crack detection microscope test

The answer is 3) Rebar locator test


8) When chloride reaches to rebar level then -------occurs.

1) Elongation.

2) Corrosion

3) Buckling

4) Bending

Answer is 2) Corrosion


9) Half-cell potential meter test is used for measurement of

1) Electrical conductivity of the reinforcement

2) Electrical potential in the reinforcement

3) To know the pH Of the concrete

4) The quantity of chloride present.

 Answer is 2) Electrical potential in the reinforcement


10) The pH measurement can be done by

1) pH strips.

2) pH pencils

3) digital meters

4) all of the above.

Answer is all of the above.

 

11) Half cell potential meter test gives probable percentage of

----------- in the reinforcement.

1) Chloride content

2) Corrosion

3) Bending of reinforcement.

4) None of the above.

Answer is 2) Corrosion


12) Half-cell potential method test is conducted and the result of half-cell potential meter test shows the result of 300 then what is the probable percentage of corrosion in the bar

1) 10%

2) 20%

3) 30%

4) 50%

Answer is 4) 50% 

 

Half-Cell Potential relative to Cu-Cu Sulphate reference electrode in (mv)

Probable % of corrosion

Remark

Zero

0%

No corrosion

Less than 200

10%

Corrosion is at very early stage but no corrosion on the surface of the bars

Between 200 to 350

50%

First sign of corrosion and will be visible on the surface of the bars.

Above 350

90%

Corrosion is in notorious stage with evident corrosion sign on the bars and in some cases on the concrete too.

 

 

13) Which of the following factors affects the result of ultrasonic pulse velocity test.

1) Quality of concrete

2) Nature of concrete surface

3) Age of concrete

4) All of the above.

Answer is 4) All of the above.

 

14) Which of the following test is conducted for determining the width and depth of crack in the structure.

1)Chloride test.

2) Crack detection micro-scope test

3)Rebar locator test

4. NOTA

Answer is 2) Crack detection micro-scope test

 

For detailed explanation of above questions in simple Hindi Language, Pls watch the following video.



 #mcq #maintenanceandrepairofstructures #CE6I #MSBTE #hindi #mrs #onlinemcqonmaintenanceandrepairofstructures #buildingmaintenancecivilengineering #buildingmaintenancehindi #maintenanceinterviewquestions #civilmaintenanceengineerinterviewquestions #maintenanceengineeringimportantquestions #maintenancesupervisorinterviewquestionsandanswers #maintenancesupervisorinterviewquestionsandanswersinhindi #repairandmaintenanceofbuilding

 

Post a Comment

0 Comments

Ad Code

Responsive Advertisement